Construction starts for US$9-billion airport transformation project in Texas

The Dallas Fort Worth International Airport (DFW) in Texas, US, started construction work in the final days of August for a US$9-billion transformation project.

Render of future Terminal C at DFW airport (Image courtesy DFW Forward) A render of the future Terminal C at Dallas Forth Worth airport in Texas, US. (Image courtesy DFW Forward)

The capital plan 鈥 called DFW Forward 鈥 consists of upgrading terminals (including a $3-billion price tag to rebuild Terminal C), airfields, and transport systems across more than 180 projects.

Fort Worth Mayor Mattie Parker said, 鈥淭he reimaging of Terminal C is a significant step forward in ensuring that DFW Airport maintains its status as a top aviation hub.鈥

The 鈥楥鈥 terminal, according to DFW, is the airport鈥檚 busiest and most 鈥渙utdated鈥.

In addition to expanding interior space for new facilities, shops, and restaurants, the Terminal C rebuild will also improve security checkpoints and restrooms.

An initial phase of construction and expansion of Terminal C will predicate second and third phases of demolition and rebuilding, said DFW.

鈥淎lso included in the project, and taking place concurrently with the first phase of Terminal C鈥檚 reconstruction, are double-loaded pier expansions of both Terminal C and Terminal A,鈥 added DFW.

The air travel authority noted the work will add 115,000 sq ft (10,684m2) and four gates to Terminal C and 140,000 sq ft (13,006m2) and five gates to Terminal A. A new parking structure will also be rebuilt with modern parking technologies and infrastructure. The existing structure is scheduled to close on 14 September for a planned demolition later this year.

The consortium design-and-build team constructing the two terminals consists of Texas-based firms Alpha & Omega (roofing and construction), commercial builders Austin Commercial and construction firm Azteca Enterprises. UK-based HOK and American firm Muller & Muller are listed as designers.

The Terminal C portion of the scheme is expected to finish in 2030.

Additional major works in DFW Forward include a 15-gate expansion to Terminal F, construction of an electric central utility plant to supply energy from 鈥100% renewable resources鈥, an east-west throughfare roadway, and a fire station modernisation project, among others.

DFW airport project demo (Image courtesy DFW Forward) DFW representatives participate in a ceremonial demolition for the airport鈥檚 Terminal C expansion and rebuild project. (Image courtesy DFW Forward)
STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Deputy Editor, Editorial, UK 鈥 Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA